SOFTWARE ENGINEERING
(BSCS55) – MCQs – 05/11/2020
SE – MCQ7
(01) Which of the
following cohesion is worst?
(A) Co – Incidental
Cohesion (B)
Functional Cohesion
(C) Logical Cohesion (D)
Sequential Cohesion
(02)
·
This is an extension of the information hiding concept
·
It is an intra - module concept
Which is being said in
both the above statements?
(A) Coupling (B)
Cohesion
(C) Software Assurance (D)
Requirements Engineering
(03)
·
This is an indication of interconnection between module sin a
structure of a software
·
It is an inter - module concept
(A) Coupling (B) Cohesion
(C) Software Assurance (D)
Requirements Engineering
(04) Which of the
following is not a verification activity?
(A) Inspection (B)
Testing
(C) Walk through (D)
Technical review
(05) Which coupling is
the worst?
(A) Content Coupling (B)
Control Coupling
(C) Data Coupling (D)
External Coupling
<<<<<ANSWERS WILL BE GIVEN TOMORROW>>>>>
Answers for Nov 04, 2020 (SE – MCQ6)
(01) B (02) B (03) C (04) D (05) C