Slideshow

Automatic Slideshow

1 / 7
III YEAR STUDENT, Mr. ASHIK ALI RECEIVING THE MEDAL FROM THE CHIEF GUEST FOR WINNING IN THE QUIZ COMPETITION

Automatic Slideshow

2 / 7
COLLEGE STAFFS WITH THE CHIEF GUEST Mr. DAMODARAN SELVARAJ OF INFOSYS @ DEPT. FUNCTION - 2022 (From L to R): Mrs. SUGANTHI, Mrs. SATHYA, Mr. PANDIYAN, Mr. SAKTHIVEL, Mr. DAMODARAN SELVARAJ, Mr. SENTHIL KUMAR & Mr. SURIYAN

Automatic Slideshow

3 / 7
CHIEF GUEST, Mr. DAMODARAN SELVARAJ OF INFOSYS, LIGHTNING THE LAMP @ DEPT. FUNCTION - 2022

Automatic Slideshow

4 / 7
ANANTHARAJ OF III B. Sc., CS RECEIVING THE BEST STUDENT AWARD FROM CHIEF GUEST @ DEPT. FUNCTION - 2022

Automatic Slideshow

5 / 7
CHIEF GUEST, Mr. DAMODARAN SELVARAJ OF INFOSYS ARRIVING FOR THE DEPT. FUNCTION - 2022

Automatic Slideshow

6 / 7
SHEELA METILDA OF I B. Sc., CS RECEIVING THE MEDAL FROM THE CHIEF GUEST, Mr. DAMODARAN SELVARAJ OF INFOSYS @ DEPT. FUNCTION - 2022

Automatic Slideshow

7 / 7
Mr. THAJUDEEN OF III B. Sc., CS GIVING THE VOTE OF THANKS @ DEPT. FUNCTION - 2022

Followers

Today's Quotes

The Best Preparation for Tomorrow is doing Your Best Today.......

Wednesday, November 4, 2020

SOFTWARE ENGINEERING (MCQs): Nov 05, 2020

     


 SRI LAKSHMI COLLEGE OF ARTS & SCIENCE

DEPARTMENT OF COMPUTER SCIENCE

III B. Sc., CS

SOFTWARE ENGINEERING (BSCS55) – MCQs – 05/11/2020

 SE – MCQ7

(01) Which of the following cohesion is worst?

(A) Co – Incidental Cohesion                                       (B) Functional Cohesion

(C) Logical Cohesion                                          (D) Sequential Cohesion

(02)

·        This is an extension of the information hiding concept

·        It is an intra - module concept

Which is being said in both the above statements?

(A) Coupling                                                       (B) Cohesion

(C) Software Assurance                                                (D) Requirements Engineering

(03)

·        This is an indication of interconnection between module sin a structure of a software

·        It is an inter - module concept

(A) Coupling                                                        (B) Cohesion

(C) Software Assurance                                                (D) Requirements Engineering

(04) Which of the following is not a verification activity?

(A) Inspection                                                      (B) Testing

(C) Walk through                                                         (D) Technical review

(05) Which coupling is the worst?

(A) Content Coupling                                         (B) Control Coupling

(C) Data Coupling                                              (D) External Coupling

<<<<<ANSWERS WILL BE GIVEN TOMORROW>>>>>

Answers for Nov 04, 2020 (SE – MCQ6)

(01) B                   (02) B                   (03) C         (04) D         (05) C