Slideshow

Automatic Slideshow

1 / 7
III YEAR STUDENT, Mr. ASHIK ALI RECEIVING THE MEDAL FROM THE CHIEF GUEST FOR WINNING IN THE QUIZ COMPETITION

Automatic Slideshow

2 / 7
COLLEGE STAFFS WITH THE CHIEF GUEST Mr. DAMODARAN SELVARAJ OF INFOSYS @ DEPT. FUNCTION - 2022 (From L to R): Mrs. SUGANTHI, Mrs. SATHYA, Mr. PANDIYAN, Mr. SAKTHIVEL, Mr. DAMODARAN SELVARAJ, Mr. SENTHIL KUMAR & Mr. SURIYAN

Automatic Slideshow

3 / 7
CHIEF GUEST, Mr. DAMODARAN SELVARAJ OF INFOSYS, LIGHTNING THE LAMP @ DEPT. FUNCTION - 2022

Automatic Slideshow

4 / 7
ANANTHARAJ OF III B. Sc., CS RECEIVING THE BEST STUDENT AWARD FROM CHIEF GUEST @ DEPT. FUNCTION - 2022

Automatic Slideshow

5 / 7
CHIEF GUEST, Mr. DAMODARAN SELVARAJ OF INFOSYS ARRIVING FOR THE DEPT. FUNCTION - 2022

Automatic Slideshow

6 / 7
SHEELA METILDA OF I B. Sc., CS RECEIVING THE MEDAL FROM THE CHIEF GUEST, Mr. DAMODARAN SELVARAJ OF INFOSYS @ DEPT. FUNCTION - 2022

Automatic Slideshow

7 / 7
Mr. THAJUDEEN OF III B. Sc., CS GIVING THE VOTE OF THANKS @ DEPT. FUNCTION - 2022

Followers

Today's Quotes

The Best Preparation for Tomorrow is doing Your Best Today.......

Tuesday, October 27, 2020

SOFTWARE ENGINEERING (MCQs): Oct 28, 2020

 

 

SRI LAKSHMI COLLEGE OF ARTS & SCIENCE
DEPARTMENT OF COMPUTER SCIENCE

III B. Sc., CS

SOFTWARE ENGINEERING (BSCS55) – MCQs – 28/10/2020

 SE – MCQ2

(01) PDCA cycle is associated with

(A) Software Project Estimation                         (B) Software Reviews

(C) Software Testing                                           (D) Software Quality Assurance

(02) Gantt Chart is a

(A) Flow diagram / chart                                    (B) Timeline diagram / chart

(C) Data diagram / chart                                    (D) Model diagram / chart

(03) Abbreviate the term SMI.

(A) Software Maturity Index                              (B) Software Model Instruction

(C) Software Maturity Instruction                     (D) Software Model Index

(04) The typical formula for software estimation model is

(A) E = a + b (S)c                                                          (B) E = a * b (S)c

(C) E = (a/b)(S)c                                                            (D) E = a+bc(S)

(05) What is an equivalence partition?

(A) A set of test cases for testing classes of objects

(B) An input or output range of values such that only one value in the range becomes a test case

(C) An input or output range of values such that each value in the range becomes a test case

(D) An input or output range of values such that every tenth value in the range becomes a test case.

<<<<<ANSWERS WILL BE GIVEN TOMORROW>>>>>

Answers for Oct 27, 2020 (SE – MCQ1)

(01) D                   (02) A                   (03) A         (04) A         (05) C

(06) C                   (07) A                   (08) D         (09) A         (10) B

 


No comments:

Post a Comment